Suggestion #156
Add line x of y to running process dialog
Status:
New
Priority:
Normal
Assignee:
-
Start date:
07/03/2019
Due date:
% Done:
0%
Description
Logged on behalf of Ian Smith
DfRefactor takes a long time to process source files with 10s of
thousands of lines. Is it possible to add a line x of y count to the
Running Process dialog?
The Chilkat wrapper being a prime example 69713 lines.
We did look at this before and decided against it back then due to slowing down the process.
Perhaps we can do something like updating the every 1000 lines which probably won't slow down things much.
Related issues
History
#1 Updated by Wil van Antwerpen over 5 years ago
- Related to Bug #158: Running a refactor over MSExcel can be really slow added